Fypon Quick Rail Gate Kit Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pour la maison Fypon Quick Rail Gate Kit. Fypon Quick Rail Gate Kit User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Tools Required
Need help? 1.800.446.3040 www.fypon.com
Gate Kit
Installation Instructions
Level
SquarePersonal Protective
Equipment
Screwdriver
Drill with #
1
/
8
Phillips
Head Bit
Tape Measure
Before You Begin:
Important Information
Gates are precut to fit a 37
1
/
2
" wide opening, but can
be trimmed for smaller applications. Be sure to check with local
building code officials for any dimension requirements.
Gate kits should only be used for applications that are no more than
30" above ground.
Gate Kit Installation
Insert spindles into precut holes on bottom rail.
Place top rail on spindles. This is best done by holding the rail at a slight upward angle
and inserting spindles one at a time into precut holes (Figure 1).
With spindles in the top and bottom rails, slide rail ends into the precut holes of one of
the 4" x 4" sleeves. This is best done by laying sleeve on its side with the precut holes
facing up and placing rail ends into holes while applying pressure on the rails.
With the rail ends pointed up, slide the second 4" x 4" sleeve into place and stand gate
assembly upright with spindles vertical.
Make sure all rail ends are flat against the inside wall of the 4" x 4" sleeves. Before
proceeding to the next step, you may want to use some strap clamps to keep the gate
assembly together.
Secure the top and bottom rails in place by inserting one of the provided #10 x 1
1
/
4
"
Phillips Pan Head screws into the rail on the inside of the sleeve, directly beside the
precut hole in the sleeve. This is best done by drilling a
1
/
8
" pilot hole
3
/
16
" from the edge
of the sleeve in the center of the rail (Figure 2). Do this on both sides of the top and
bottom rail.
Place the gate assembly on the ground and square it using a carpenter square or some
other method.
Mark the pre-drill holes at the locations indicated in Figure 3 using
1
/
8
" drill bit. Make
sure to drill through both the sleeve wall and the top rail wall (Figure 3).
Use the provided #10 Phillips Pan Head screws and thread into the holes drilled
previously.
Turn the assembly over and repeat steps 9 & 10. A total of 8 screws should be used for
steps 9-11. This helps prevent the gate from sagging after it is mounted.
Measure and attach the gate hinge and latch at desired location using the provided #14
x
3
/
4
" Phillips Pan Head screws (making sure to pre-drill first using an
1
/
8
" drill bit). Note:
The gate hinges and latch must be secured and attached to the adjacent post sleeve
with structural wood support inside.
Attach taper caps with PVC glue. Note: The gate may need leveled periodically due to
changes in temperatures. This can be done by adjusting the hinges.
®
®
Figure 1
Figure 3
Figure 2
®
Warranty Information
Fypon warrants all QuickRail
products to be free from defects
in material and workmanship. For
complete warranty details, visit the
Product Support section at
www.fypon.com.
Vue de la page 0
1

Résumé du contenu

Page 1 - Gate Kit

Tools RequiredNeed help? 1.800.446.3040 • www.fypon.comGate KitInstallation InstructionsLevelSquarePersonal Protective EquipmentScrewdriverDrill wi

Commentaires sur ces manuels

Pas de commentaire